BTW’s survey team didn’t slow down through Level 4 Covid Restrictions. Some of our team was safely office based for a prolonged period of time to fast track our 3D BIM modelling services for clients with vital infrastructure projects.
Throughout a project’s entire duration BIM technology allows for streamlined collaboration and the sharing of complex information across the different design services and wider project teams.
This highly accurate 3D model of sand filters at a wastewater treatment plant, is one such project. The 3D model is georeferenced to a site survey also carried out by BTW (all fieldwork visits were carried out prior to Covid-19 Restrictions).
BIM – Smart technology that improves the process and the outcome.
For more information on BIM services at BTW, talk to our Surveying team or click here: https://www.btw.nz/services/surveying/building-information-modelling-bim/