Tomorrow at dawn a special ceremony will be held at Owae Marae to mark the reopening of the rebuilt wharekai. The extensive redevelopment has been in the making for some time, and is about creating fit-for-purpose facilities for future generations.
You can read more here: https://www.stuff.co.nz/pou-tiaki/131457565/dawn-ceremony-to-reopen-wharekai-at-famed-taranaki-marae-after-4m-redevelopment?
BTW are proud to have contributed many professional services to this project, including;
– Topographic Survey pre-design and then the survey setout of both the Wharenui & Wharekai
– Water sensitive design including rainwater harvesting and reuse, water quality treatment and integration with the NPDC Tangaroa Stormwater upgrades
– Geotechnical and structural engineering for the Wharekai and Wharenui Upgrades